Language
English English Russian
Position :
2022-12-09
Haiphong Power Plant Project in Vietnam
Power plant valve equipment replacement
Vide More
Vietnam
2021-09-10
Công ty Nhôm Đắk Nông–TKV
Project repair and replacement
Vide More
Vietnam
2021-09-10
Công ty TNHH MTV nhôm Lâm Đồng-TKV
Project repair and replacement
Vide More
Vietnam
2020-11-30
Pha Lai Thermal Power Plant Proecjt,Vietnam
As a medium load and peak load power plant, the power plant is equipped with a 141.5-meter cooling tower (diameter of 100 meters and 60 meters at the top), which is also an exhaust chimney. The turbine system consists of a shaft, a four-cylinder condenser turbine, composed of a high pressure, a medium pressure, and two low pressure turbines. Valves include butterfly valves, gate valves, check valves, in particular the YUMING VALVE GROUP,
Vide More
Vietnam
2020-11-30
HaiPhong Power plant Project, Vietnam
Technology upgrade
Vide More
Vietnam
2020-11-30
Project Vietsopetro
With the continuous expansion of the company's scale, the establishment of new offices, and the ...
Vide More
 1 2 3 4 
Quick consultation
Name:
Email:
Phone:
Type:
Size:
Message:
Copyright: 1972-2020 Yuming Valve Group Co,Ltd. All rights reserved.